Home Recent
Request an Account Sign in
Account Request Page

 

PERSONAL DATA

Name

Reza

Family name

Besharati Tabrizi

Date of birth

10/02/1968

Education

B Sc Mechanical Engineering

Marital status 

Married

No. Children

1 / Date of Birth 29/08/1998

Mobile phone

0098

0912

19 09 45 9

Home phone

0098

021

44 07 63 20

Email

Skype

rezabesharati

Web page

 

Address

 

 

Summary:

 

I have 16 years of work experience in:

·       Commercial / Technical Project Management and Planning within Power Generation and Oil/Gas/ Petrochemical Industry.

·       Sales and Marketing of Rotating Equipments / Spare Parts and Services

·       Oxygen Plants, Thermal Oxidizers, Power Generation Packages, Desalination Units.

I am a multifaceted / multifunctional Mechanical Engineer with hardworking attitude and an absolute self starter. 

 

Career Objective:

I would like to work in a commercial / technical role to spearhead company growth and development with the use of strategic methodology and analytical and practical techniques.

 

SUMMARY - CAREER BACKGROUND / Bachelor of Mechanical Engineering

Company

Position

Industry

From

To

Basser Kala Co.
www.basserkala.com

And its sister company Energy Deployment Ltd.

www.energydeployment.com

Established 1986 in London and Tehran at the same time

 

Commercial
Sales and Marketing Manager

 

Energy / Oil and Gas / Petrochemical

2004

2008

Pargasiran Co.
www.pargasiran.com

Established 1988 in Iran mainly for shipbuilding and switched to OGP sector

Projects Purchasing Manager

 

Engineering

2003

2004

Sideco spa (Tehran)
www.sideco.it

Established in 1977 in Genoa / Italy, active in Supply of pipes, fittings, flanges, valves, pumps, consumables and instruments to O/G/P sectors and under the same management in Iran since 1995 as Comar Eng. Active in Desalination and Water Treatment Facilities / Power Generation Boilers and Gas Turbine Power Plant 

Technical Sales Manager

Corporate Planning and Monitoring Manager

 

Supply / Energy / Desalination

2000

2003

Butan Gas Company www.butaneco.com

Established 1950 mainly active in LPG distribution facilities and transit

Projects Manager

Energy / LPG

1998

1999

Perlite Co.

www.perlite-co.com

Established in 1980 and grew to the largest private general contractor in civil and mechanical construction

 

Senior Mechanical Engineer

Construction

1993

1997

 

 

Commercial / Sales and Marketing Manager / Basser Kala Co / 2004 – Today

Market leader in Compression and Power Generation  Equipment and Spares / Chemicals supply

Category/Project

Principle/Functionality

Achievement/Responsibly

Industrial Gas Turbines component supply and repair

API 616

Turbo Services Network / Turbo Care Inc.

Component supply and repair

Realized turnover 2 million / annum

1.     Acquire business

2.     Market development

3.     Price negotiation

4.     Sales commercial and technical support

5.     Project definition, planning and management

6.     LTSA Contract administration

Centrifugal Gas Compressors

API 617

 

Siemens Industrial Turbo Machinery /
Spare Parts Supply

Since 2004

Av. turnover 6 million / annum

7.     Design and Implementation of Compressor Spares Sales Support System

8.     Development of After Sales Services covering a fleet of 118 Centrifugal Compressors in 12 geographical locations across the country

9.     Coordinate supply tasks between Siemens PLC's (Duisburg/Hengelo) and RE's  (Siemens Dubai , Siemens Iran)

10.   Increase of revenue by 200% in first year

Blades, Buckets, IGV's, EGV's, Labyrinths  for 
Steam Turbine

Gas Turbine

Axial Compressor 

Stork Turbo Blading B. V. /

Sales And Marketing

Since 2006

Realized turnover 2.5 million / annum

1.     Acquire business

2.     Price negotiation

3.     Sales technical support

4.     Market development

5.     Identification of partnership opportunities

Industrial Gas Turbines

API 616

Siemens Industrial Turbo Machinery /

Sales New Units

Since 2006

Av. Expected turnover 25 million / annum

1.     Acquire business

2.     Commercial and Technical coordination

3.     Sales Contract Administration

4.     Financial admin. and APG / PBG handling

Water Treatment Chemicals
Process Chemicals

KURITA GmbH /

Marketing / Business Development

Since 2004

Av. Expected turnover 0.5 million / annum

Currently it is 100,000

/annum

1.     Developed market share in highly competitive market for Water Treatment Chemicals

2.     Acquire business as No Cure No Pay Test run for cooling water systems in ARAK Petrochemical Company (The biggest Petrochemical Company in central Iran)

3.     Acquiring the contract for Site Service to ST PC , for boiler treatment with MHI the main subcontractor for Iranian PET Petrochemical

4.     Commercial and Technical coordination

5.     Sales Contract Administration

Thermal Oxidizers

Industrial Incinerators

Gencor Beverly /

Sales Projects

Since 2004

Realized turnover 1 million / annum

 

1.     Acquire business

2.     Promote incinerator equipment sale in industrial and oil / gas / petrochemical sector

3.     Participate in tender for an incinerator, managed to get short listed amongst 12 bidders, managed site visit to Halul Island in Qatar along with the deputy plant manager of ARAK PC who is the client.

4.     Identification of partnership opportunities

Oxygen Production Plant

SIAD Spa /

Sales Projects

Since 2005

 

1.     Acquire business

2.     Commercial and Technical coordination

I have three subordinates:

1- Compressor Spare Parts Manager / M. Sc. Mechanical Engineering ;

2- Compressor Spare Parts Expediter  / B. Sc. Mechanical Engineering ;

3- Chemical Sales Engineer / M. Sc. Chemical Engineering

 


 

Projects Purchasing Manager / Pargasiran Co. / 2003-2004

Engineering and Fabrication Company / Specialist in Oil/Gas and Petrochemical Fixed Equipment (Separators / Reactor Columns/ Heat Exchangers, PIG Launcher Receivers / Coalescer  Filters 

Category/Project

Principle/Functionality

Achievement/Responsibly

E-Procurement

Procurement Management

1.     Managed to procure project items for 23 procurement tasks within 3 months concurrent with the development of the E-Procurement solution for the company 

2.     Compiled vendor list to cover all foreign procurement activities of the company

3.     Designed the procurement procedure workflow diagram utilizing  SSADM methodology 

4.     Developed procurement software in VB and Excel with the following capabilities:

a.     Total no of vendors : 20

b.     Total no. of categories : 13
Plates, Pipes, Tubes, Fittings, Flanges, Tube Sheets,

c.      Track the progress of project procurement vs. the planned status

d.     Issue of PO and track the inspection and delivery to destination

System Engineering

ISO 9001 Procedure Development

1.     Supervised development of project planning and monitoring working procedures

2.     Developed workflow diagram for tendering and procurement on over 130 stages. 

 

 


 

Technical Sales Manager / Sideco spa (Tehran)/ 2000-2003

Italian leading supplier of pipes/fittings/flanges/valves or assorted packages for oil/gas/petrochemical projects worldwide, since 1977

Comar Engineering Company MD was Sideco spa MD to offer expediting services to ANSALDO Energia and MAPNA during the 32 gas power plant project with total value of 1 billion euro, I started as expediter engineer and  very quickly became the technical manager of the company 

Category/Project

Principle/Functionality

Achievement/Responsibly

Sales and Aftermarket Services

 

Technical Sales Manager 

Approximate sales record €7 million

1.     Set up and utilize the team to support all the aftermarket services to the customers for major supply packages (5,000 to 8,000 items per package)

2.     Organize the computer network and setup the software for email server (MDemon) and network server (Windows 2000) to manage both of the Sideco spa and local expediting and procurement services activities (to ANSALDO Energia on 32 gas turbine power plant project.

3.     Technical .and contractual negotiations on all the aspects of ongoing supply projects

4.     Business promotion of the company in new projects in technical sections.

5.     Resolution of technical issues arising during quotation and after submission of purchase orders.

6.     Coordination of inspection between Sideco and inspector and the client.

7.     Coordination of shipment between Sideco and the client.

8.     Setup a producer data base for almost 1000 producers worldwide.

Project planning and management

Corporate Planning Manager

Desalination facility project

(SIDEM) for Mobin Petrochemical Company

Project Duration : 19 months

Contract price: €45 million 

1.     Setup and unitization of engineering department and project team in mechanical, electrical, civil sections

2.     Hired and utilized tendering team to tender subprojects

3.     Compiled tendering procedure and import of project equipments procedure

4.     Planned and monitored water treatment and desalination project business units activities

Expediting / Project Monitoring

Air Intake and Gas Exhaust Expediting Engineer

Client: ANSALDO ENERGIA spa.

Buyer: IPDC and MAPNA

Contactor: TUGA

Sub-supplier: HEPCO and JAHAD

Number of Air intake and Gas exhaust units built: 32

Approximate project value : €4 million 



1.     Derivation of balance of contract for air intake system

2.     Derivation of balance of contract for gas exhaust system

3.     Field monitoring of fabrication activities for air intake system

4.     Field monitoring of fabrication activities for gas exhaust system

5.     Finite Element, CFD and Heat transfer study of both air intake and gas exhaust system with Fluent version 4


 

Projects Manager / Butan Gas Company / 1998-1999

The biggest company in LPG business in the country having annual sales of 10 million

Category/Project

Principle/Functionality

Achievement/Responsibly

LPG

Transporting Storage Distribution  

Procurement Management

Total No of projects : 26

Total Budget for the projects : €1 million 

1.     Designed and developed project management system The following tasks have been performed:

2.     Setting up time and cost requirement lists  for activities and resources

3.     Setting up MRP system for projects supply system and parts ordering

4.     Setting up follow-ups system for job and documentation

5.     Setting up Bill Of Material lists for major typical projects

 

 

Senior Mechanical Engineer / Perlite Construction Company / 1993-1997

The biggest company in construction category main areas of activities was refinery, pipe line, roads, tunnels and dams

Category/Project

Principle/Functionality

Achievement/Responsibly

Construction Machineries PMS and MM

Senior Engineer, Central Repair Workshop Technical Office

1.     Designed and developed of a PMS system for construction Machinery

2.     Designed and developed an Invoicing system for contractors financial control

3.     Designed and developed a project management system for machinery repair activities

4.     Designed and developed a System for spare parts ordering and purchasing control

5.     Founded Planning and follow-ups unit
Founded Repair Workshop Technical Office for Assaluyeh workshop

6.     Translated and adopted CATERPILLAR SERVICE MANAGEMENT CODE SYSTEM in- repair and maintenance activities for equipments and stock management.

7.     Designed and developed parts and materials coding system for over- 13000 items in warehouse for the project 8th refinery in BANDAR ABBASS.

 

 

Computer Skills

Category

Software

Expertise Level

Network Administration

Windows 2003 Server

Average

Windows 2000 Server

High

MDaemon Email Server

Professional

Office Administration

Microsoft Outlook 2007

Professional

Microsoft Word 2007

Professional

Microsoft Excel 2007

Professional

Microsoft Power Point 2007

Professional

Microsoft Access 2007

High

Microsoft Project 2007

Professional

Microsoft Visio 2007

Professional

Microsoft Publisher 2007

High

Microsoft Front Page 2007

Average

Adobe Acrobat Professional 8

Professional

Adobe Acrobat Designer 8

Professional

Omni Page 16

High

Engineering and Analysis 

AutoCAD Mechanical Desktop 2008

High

Fluent 6.5

Average

Gambit 2.2

Average

Pro Engineer 3.0

Average

ANSYS 11

Average

Mathematica 6.2

Professional

Desk Top Publishing and Graphic Design 

Adobe Creative Suite 3

Professional

Quark X Press 7

Professional


 

Education

Level/Institute

Degree/Major 

Year

High School / Alborz (EX-American College)

Diploma / Mathematics

1986

University / Kerman University

B. Sc. Mechanical Engineering (Thermo-Fluids) 

1991

 

Certificates /

Category

Title/Awarded From 

Year

HSE

Helicopter Underwater Escape Training [HUET],Sea Survival Training /Qatar

2006

HSE

H2S & Breathing Apparatus Training / Qatar

2006

Centrifugal Compressors

TOM Training [Thermodynamics/Operation/Maintenance] Cross Boarder Training / Siemens Hengelo / The Netherlands

2005

Project Management

Project Control and Planning

1997

 

Languages

Language

Read

Write

Speak

Usage

English

Fluent

Fluent

Fluent

Every day

German

Basic

Basic

Basic

Self study

Russian

Basic

Basic

Basic

2002